The Cybele PFAS Destruction System

Destroy PFAS at your plant, not 1,300 km away

It's a unit that goes in after your existing filters and breaks PFAS down at room temperature. You're left with no contaminated filter media to haul away.

Request a pilot See current regulations

Overhead view of a round clarifier tank at a treatment plant

Who it's for

Drinking-water utilities

You're already removing PFAS to meet the 4 ppt PFOA/PFOS limits and state standards like Massachusetts' PFAS6. Our system destroys what your filters catch, so you stop paying to dispose of spent media and stop carrying the Superfund liability that comes with it.

Wastewater treatment plants

Most plants can't destroy PFAS today, so it passes straight through to rivers. We're developing a version of our system for wastewater plants too.

How it works

1

Capture

Your existing filters pull PFAS out of the water, just as they do today.

2

Destroy

Our patent-pending process breaks the captured PFAS down on site, at room temperature and normal pressure.

3

Verify

We track where the fluorine ends up, so you can show the PFAS is actually gone.

Row of lab pipettes on a rack

What makes it different

  • It destroys PFAS. The chemicals get broken down on site, so there's nothing hazardous left to truck away.
  • It uses little energy. Everything runs at room temperature and normal pressure. On the benchtop, that's about 95% less energy than incineration.
  • It works with what you have. The unit goes in after the PFAS filters you already use.
  • Your drinking water stays separate. It never passes through the treatment stage.
  • You can see where the fluorine goes. We track a full fluorine mass balance instead of just reporting percent removal.

Where we fit in your PFAS project

  1. Engineering
    Your consultant selects the treatment system
  2. Approval
    We sell the unit once the project is approved and funded
  3. Bid & contract
    You hire a general contractor
  4. Construction
    The contractor installs our unit
  5. Start-up
    The plant is tested and commissioned
  6. Operation
    We service the unit on a regular schedule

Pilot program

Our benchtop prototype is up and running, and the process is patent pending. Now we're building a pilot system, and we're looking for Massachusetts utilities willing to host field tests.

Request a pilot

Stock photography via Unsplash.